Peter Tarzian
156 Aliso Springs Rd Tubac, AZ 85646
Job Description:
Problem: The existing gas split system was removed and replaced with a new heat pump system.
Solution: As a part of the installation, a 220V electrical supply was run to the indoor mechanical room to meet the operating requirements of the new unit. The gas supply was disconnected and capped, and the gas service to the system was cancelled. The new heat pump was installed, connected and tested to ensure proper operation.